詳細情報
NEXCOが施工及び管理する道路の山岳トンネルに関する仕様の概要の英語版です。
目次
Chapter 1 General Description
1-1 Scope of application
1-2 Terms
1-3 History and accomplishments
1-4 Contents of the outline
Chapter 2 Basic planning
2-1 Basics of planning
2-2 Tunnel alignment
2-3 Inner section of tunnel
Chapter 3 Investigation
3-1 Basics of investigation
3-2 Investigation for design and construction planning
3-3 Investigation during construction
Chapter 4 Design of tunnel
4-1 Selection of tunnel construction method
4-2 Basics of design
4-3 Design of tunnel support
Chapter 5 Design of portal and portal area
5-1 Basics of design for portal area
5-2 Design of portal
Chapter 6 Waterproof and drainage work
6-1 Outline
6-2 Waterproofing of lining
6-3 Drainage work
Chapter 7 Auxiliary method
APPENDIX TBM Excavation Technology
1. TBM in NEXCO
2. TBM pilot and enlargement excavation method
3. TBM Boring in Hida Tunnel
4. Summary of the TBM and the Others
5. Conclusions